SCHEDULED MAINTENANCE: US EAST (NA1,NA5,NA9,ASH01,ASH02) INFRASTRUCTURE
Scheduled Maintenance Report for NTT Ltd. Cloud
Update
The scheduled maintenance has been completed.
Posted Apr 27, 2017 - 09:03 UTC
Update
The scheduled maintenance has been completed.
Posted Apr 27, 2017 - 09:03 UTC
Completed
The scheduled maintenance has been completed.
Posted Apr 27, 2017 - 09:02 UTC
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Apr 27, 2017 - 04:00 UTC
Scheduled
SCHEDULED MAINTENANCE: US EAST (NA1,NA5,NA9,ASH01,ASH02) INFRASTRUCTURE

Impact: No impact to clients expected. There is a medium risk of brief periods of Internet Service Provider latency.

Dear Client

On the dates listed below the Internet Service Provider for the following locations will be performing scheduled network maintenance. The ISP will be performing hardware upgrades to upstream routers supplying internet access to the below cloud locations over 4 maintenance windows. Engineers will be failing traffic over to a redundant connection on April 25th, prior to the maintenance. Engineers will fail back to primary connection after completion of work on April 26th in preparation for maintenance on secondary link. April 27th and April 28th work will be done on our secondary link. This type of maintenance has been performed in the past without impact to traffic, however there is a medium risk of brief latency and or packet loss during the fail-over process.

Change Reference Number: CHM114720049
US EAST: (NA1,NA5,NA9, ASH01,ASH02): Tuesday April 25th 12:00 AM US Eastern Daylight Time (04:00 UTC)
Expected Total Duration: 5 Hours

Change Reference Number: CHM114720049
US EAST: (NA1,NA5,NA9, ASH01,ASH02): Wednesday April 26th 12:00 AM US Eastern Daylight Time (04:00 UTC)
Expected Total Duration: 5 Hours

Change Reference Number: CHM114728917
US EAST: (NA1,NA5,NA9, ASH01,ASH02): Thursday April 27th 12:00 AM US Eastern Daylight Time (04:00 UTC)
Expected Total Duration: 5 Hours

Change Reference Number: CHM114728917
US EAST: (NA1,NA5,NA9 ASH01,ASH02): Friday April 28th 12:00 AM US Eastern Daylight Time (04:00 UTC)
Expected Total Duration: 5 Hours

Note this maintenance is specific only to the affected data center locations and other Geographic Regions will continue to function normally.
Posted Apr 18, 2017 - 11:11 UTC
This scheduled maintenance affected: NA - US East (Managed Hosting ASH01, Managed Hosting ASH02, NTT Cloud NA9, Cloud Monitoring, CPNC).