SCHEDULED MAINTENANCE: SINGAPORE (SIN01,AP3,AP6, AP7, AP9, AP10) INFRASTRUCTURE MAINTENANCE
Scheduled Maintenance Report for NTT Ltd. Cloud
Completed
The scheduled maintenance has been completed.
Posted Aug 23, 2019 - 17:00 UTC
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Aug 23, 2019 - 12:00 UTC
Scheduled
Impact: No client impact is expected.

Dear Client

On the date and time listed below engineers will be performing maintenance in the following cloud locations. During the maintenance engineers, will be performing vendor recommended software upgrades. First, the secondary device will be upgraded during which there should be no impact to clients. Services will be failed over from the primary to the secondary device during failover packetloss /latency will be experienced. During the upgrade of the primary device clients with CPNC Site to Site VPN and Direct Connect Service without High Availability option will experience an outage for the duration of the primary device upgrade. Clients with High Availability option should not be impacted.

Change Reference Number: CHM122031047
Singapore (SIN01,AP3, AP6, AP7, AP9, AP10): Friday August 23rd 09:00 PM Japan Standard (12:00 UTC)
Expected Total Duration: 5 Hour

Note this maintenance is specific only to the affected data center locations and other Geographic Regions will continue to function normally.
Posted Aug 07, 2019 - 16:44 UTC
This scheduled maintenance affected: AP - Singapore (Managed Hosting SIN01, NTT Cloud AP3, CSfS AP9, CaaS AP6, CaaS AP7).