SCHEDULED MAINTENANCE: JOHANNESBURG (AF1,AF3,AF5,JNB01) CPNC INFRASTRUCTURE
Scheduled Maintenance Report for NTT Ltd. Cloud
Completed
The scheduled maintenance has been completed.
Posted Nov 22, 2019 - 21:00 UTC
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Nov 22, 2019 - 18:00 UTC
Scheduled
SCHEDULED MAINTENANCE: JOHANNESBURG (AF1,AF3,AF5,JNB01) CPNC INFRASTRUCTURE

Impact: During the maintenance clients with CPNC Site to Site VPN and Direct Connect Service without High Availability option will go down for 15 to 30 minutes.

Dear Client

On the date and time listed below engineers will be performing maintenance in the following cloud locations. This maintenance is necessary to perform vendor recommended IOS upgrade to network devices supporting the CPNC service. Current IOS is soon to be end of life. During the maintenance clients with CPNC Site to Site VPN and Direct Connect Service without High Availability option will go down for 15 to 30 minutes while the devices reload. Clients with High Availability may see brief latency during fail-over process.

Change Reference Number: CHM122575337
Johannesburg: (AF1,AF3,AF5,JNB01): Friday November 22nd 08:00 PM South Africa Standard Time (18:00 PM UTC)
Expected Total Duration: 3 Hour.

Note this maintenance is specific only to the affected data center locations and other Geographic Regions will continue to function normally.
Posted Oct 17, 2019 - 09:15 UTC
This scheduled maintenance affected: AF - Johannesburg (CPNC).